Is there a way to copy Q tables or folders from one project to another? I've set up in 3 different Q files, 1 per market, but every time the survey or reporting changes over time, I have to make them in each file. That if proving to be time-consuming.
Requirements
Two or more Q projects. The questions in each project must have the same labels and the variables have exactly the same names
Method
- Open two (or more) Q projects.
- Select the outputs you want to copy
- Drag and drop them into the Outputs tab of the other project.
Next